Tuesday, October 18, 2011

Taco Bell Mania!

Bollards and Monument for Signs



Here are some interestingl jobs this year- 4 Taco Bells in different locations. The General Contractor was Shamrock Development. We worked together with them to meet their stringent time schedule. Shamrock is very committed to fulfilling their promises to their clients, such as Yum! and so are we! These were all remodels, with the exterior concrete removed and replaced with ADA compliant sidewalks and ramps. Curb and monuments for various signs, as well as block for a screen wall and dumpster, as well as the dumpster pads were also part of these assignments
Nice neat joints!



Professional Installation

That's what I'm talking about!





Dumpster:
(1) day-Remove asphalt
             Remove 8" hardpan limerock
             Grade/compact

 (1) day- Install forms for curb perimeter
               Install rebar mat
               Install rebar for block at perimeter
(1) day-Pour slab
             Remove forms-dress concrete
             Saw with early entry saw
(1) day-Install block
             Inspection
             Fill block same day
Clean! 

Sunday, October 16, 2011

Kimmins-22nd St. Improvement

Here are some pictures of some crosswalks we did on 22nd st. just north of University Square Mall. These included header curbs 1'x1' as well as 8" concrete in the recessed area with a double mat of rebar. The recess is lined with pavers on an inch of sand.

Wednesday, March 10, 2010

Interior pictures of house!

More House Pictures

Some more great house pictures!

     
  

Front of house

Update on house!


Unfortunately, we put this house up so fast, that I neglected to get pictures of the whole process. As you can see however, the slab and house has turned out nicely. In fact, the homeowner, has expressed his delight in using us on more than one occasion! Most importantly, the house was laid out perfectly, the slab put in very level, and the masonry was done perfectly also. The framers enjoyed it, as they told me that when they measured from the rear of the home to the front and from the front to the rear, that all the framing was right on the money! This has made it possible for them to complete their job ahead of schedule also.