Saturday, October 29, 2011

Plumbing Channels

Plumbing Channels for Precise Construction-Kevin Emmons Superintendent






Thursday, October 27, 2011

St. Pete Times Forum!

Sidewalk  for Clear Channel-
Lane Closure
Demolition
Replace existing concrete
Another Great Job!

Concrete+Finisher-St.+Pete+Times+Forum

Concrete just poured-sidewalk+St. Pete Times Forum

More Sidewalk-St. Pete Times Forum

St. Pete Times Forum-Compacting dirt

St. Pete Times Forum-Its always in the details

Sunday, October 23, 2011

Cigar City Brewing!

Check out these pictures of the dynamic Cigar City Brewery's new expansion!

Trench Drain-Rebar much more intense than would appear here! Check Detail above


Trench Drain-Redner Enterprises






2' thick slab with block structure 16 feet tall

Smooth Concrete Floor


Bright Room for the brewery-trench drains in place

Close up of drain and rebar
 

Tuesday, October 18, 2011

Taco Bell Mania!

Bollards and Monument for Signs



Here are some interestingl jobs this year- 4 Taco Bells in different locations. The General Contractor was Shamrock Development. We worked together with them to meet their stringent time schedule. Shamrock is very committed to fulfilling their promises to their clients, such as Yum! and so are we! These were all remodels, with the exterior concrete removed and replaced with ADA compliant sidewalks and ramps. Curb and monuments for various signs, as well as block for a screen wall and dumpster, as well as the dumpster pads were also part of these assignments
Nice neat joints!



Professional Installation

That's what I'm talking about!





Dumpster:
(1) day-Remove asphalt
             Remove 8" hardpan limerock
             Grade/compact

 (1) day- Install forms for curb perimeter
               Install rebar mat
               Install rebar for block at perimeter
(1) day-Pour slab
             Remove forms-dress concrete
             Saw with early entry saw
(1) day-Install block
             Inspection
             Fill block same day
Clean! 

Sunday, October 16, 2011

Kimmins-22nd St. Improvement

Here are some pictures of some crosswalks we did on 22nd st. just north of University Square Mall. These included header curbs 1'x1' as well as 8" concrete in the recessed area with a double mat of rebar. The recess is lined with pavers on an inch of sand.