Saturday, October 29, 2011
Thursday, October 27, 2011
St. Pete Times Forum!
Sidewalk for Clear Channel-
Lane Closure
Demolition
Replace existing concrete
Lane Closure
Demolition
Replace existing concrete
Another Great Job! |
Concrete+Finisher-St.+Pete+Times+Forum |
Concrete just poured-sidewalk+St. Pete Times Forum |
More Sidewalk-St. Pete Times Forum |
St. Pete Times Forum-Compacting dirt |
St. Pete Times Forum-Its always in the details |
Sunday, October 23, 2011
Cigar City Brewing!
Check out these pictures of the dynamic Cigar City Brewery's new expansion!
Trench Drain-Rebar much more intense than would appear here! Check Detail above |
Trench Drain-Redner Enterprises |
2' thick slab with block structure 16 feet tall |
Smooth Concrete Floor |
Bright Room for the brewery-trench drains in place |
Close up of drain and rebar |
Tuesday, October 18, 2011
Taco Bell Mania!
Bollards and Monument for Signs |
Here are some interestingl jobs this year- 4 Taco Bells in different locations. The General Contractor was Shamrock Development. We worked together with them to meet their stringent time schedule. Shamrock is very committed to fulfilling their promises to their clients, such as Yum! and so are we! These were all remodels, with the exterior concrete removed and replaced with ADA compliant sidewalks and ramps. Curb and monuments for various signs, as well as block for a screen wall and dumpster, as well as the dumpster pads were also part of these assignments
Nice neat joints! |
(1) day-Remove asphalt
Remove 8" hardpan limerock
Grade/compact
(1) day- Install forms for curb perimeter
Install rebar mat
Install rebar for block at perimeter
(1) day-Pour slab
Remove forms-dress concrete
Saw with early entry saw
(1) day-Install block
Inspection
Fill block same day
Clean!
Sunday, October 16, 2011